Rough and finish carpentry takeoffs: framing lumber by board foot and piece, sheathing by sheet, engineered products by length, hardware by count.

Approach

How we estimate wood framing

Framing lumber is priced by the board foot but bought by the piece, so we report both. Studs, plates, headers, joists, rafters and blocking are listed by size and length with a stated waste factor, then rolled up to board feet for pricing and to piece counts for ordering.

Engineered lumber, trusses, sheathing, hardware and fasteners each get their own lines. Finish carpentry and millwork are measured from the architectural details and schedules so casework and trim do not get lost in a per-square-foot allowance.

Division 06Typical detail, drawn for illustration
Drawings used
S-200 framing plans, A-300 wall sections, A-600 interior elevations & millwork, Spec 06 10 00 / 06 41 00
Reported in
BF · EA · LF · SF · SHEET · LB
Format
Editable Excel workbook, division tab with sheet references; PDF summary; written exclusions and assumptions.
Turnaround
Confirmed after we review the set and the project date.

Excluded by default

  • Doors, windows and hardware (Division 08)
  • Insulation and weather barrier (Division 07)
  • Gypsum board (Division 09)
  • Structural steel members within wood framing (Division 05)
  • Truss engineering and stamped drawings
  • Temporary bracing and shoring beyond standard practice
What we measure

Line items in a wood framing takeoff

Every group below is a separate section of the workbook. Units shown are the units the estimate reports in.

Wall framing

BF · EA · LF
  • Studs by size, spacing and heightEA / BF
  • Bottom plates, P.T. where requiredLF / BF
  • Double top platesLF / BF
  • Headers by size and spanEA / BF
  • King, jack and cripple studsEA / BF
  • Blocking, backing and fire blockingLF / BF

Floor & roof framing

BF · LF · EA
  • Joists and rafters by size and lengthEA / BF
  • I-joists and LVL by designationLF
  • Rim board and ledgersLF
  • Beams and girders, sawn or engineeredLF / EA
  • Roof and floor trussesEA
  • Bridging, blocking and hangersLF / EA

Sheathing & decking

SF · SHEET
  • Wall sheathing by type and thicknessSF / SHT
  • Roof sheathingSF / SHT
  • Subfloor and underlaymentSF / SHT
  • Exterior gypsum sheathingSF / SHT
  • Wood decking and porch framingSF / BF
  • Waste by panel layout%

Hardware & fasteners

EA · LB
  • Joist hangers and hurricane tiesEA
  • Hold-downs and strapsEA
  • Anchor bolts and sill plate anchorsEA
  • Nails and screws by typeLB / BOX
  • Construction adhesiveTUBE
  • Post bases and capsEA

Finish carpentry

LF · EA
  • Base, casing and crown by profileLF
  • Door and window trim setsEA
  • Wood doors and frames (coordinate Div 08)EA
  • Stair parts: treads, risers, railsEA / LF
  • Wood paneling and wainscotSF
  • Shelving and closet systemsLF

Millwork & casework

LF · EA
  • Base and wall cabinets by elevationLF
  • Countertops by materialLF / SF
  • Reception desks and custom unitsEA
  • Laminate vs. wood veneer by finish scheduleSF
  • Hardware: pulls, hinges, slidesEA
  • Installation labor by unitLF / EA
Sample output

A wood framing takeoff, as delivered

Two-story wood-frame office, 9,600 SF · estimate.xlsx
SummaryDiv 06ExclusionsAssumptions
Two-story wood-frame office, 9,600 SF estimate sample
DescriptionQtyUnitSheetMaterialLaborTotal
2x6 studs @ 16" O.C., 9'-1-1/8"1,480EAS-20113,32011,84025,160
Plates, headers, blocking, 2x material9,800BFS-2019,3105,88015,190
11⅞" I-joists @ 16" O.C.4,320LFS-20215,1208,64023,760
7/16" OSB wall sheathing8,900SFA-3016,2304,45010,680
Roof trusses, 32' span, 4:1262EAS-20324,8009,30034,100
Hangers, straps, hold-downs, fasteners1LSS-5015,4002,7008,100
Division 06 subtotal74,18042,810116,990
Basis: Quantities from S-201 through S-203 and A-301 in the issued plan set. SPF #2 framing, 10% waste on studs, 8% on sheathing.
Wood & Plastics questions

Specific to this trade

Why report both board feet and piece count?

Suppliers quote framing by the thousand board feet, but crews order and carry pieces. You need the board-foot number to price material and the piece count to order it and estimate handling labor.

What waste factor do you use on studs?

Typically 10% on studs and plates, 8% on sheathing, adjusted for complex layouts or non-standard heights. The percentage is stated on the estimate.

Do you price trusses or stick framing?

Whichever the drawings show. If the set leaves it open, we price the option stated in the structural notes and flag the alternative as a voluntary alternate.

Wood & Plastics bid due soon?

Send the relevant sheets and we'll come back with a price and a date.