Trades / Division 26
Division 26 · Electrical

Electrical estimating & takeoff services

Electrical takeoffs from plans, one-line diagrams and schedules: gear by the each, feeders by size and length, branch circuits, devices, fixtures and low-voltage rough-in all counted separately.

Approach

How we estimate electrical

Electrical estimating is a count-and-measure discipline. Devices, fixtures, boxes and gear are counted by the each from the plans and schedules; feeders and branch circuits are measured by size and length from the plans and one-line, with conduit and wire carried separately so material can be priced against current copper cost.

Home-run lengths, panel schedules, lighting fixture schedules and the one-line diagram are reconciled against each other so the feeder count matches the breaker count and the fixture count matches the circuiting. Low-voltage rough-in is included where the electrical contractor typically carries it.

Division 26Typical detail, drawn for illustration
Drawings used
E-100 lighting plans, E-200 power plans, E-500 one-line & panel schedules, E-600 fixture schedule, Spec 26 05 00 / 26 24 00 / 26 27 00 / 26 51 00
Reported in
EA · LF · LS
Format
Editable Excel workbook, division tab with sheet references; PDF summary; written exclusions and assumptions.
Turnaround
Confirmed after we review the set and the project date.

Excluded by default

  • Utility company fees and primary service
  • Telecommunications cabling and termination (Division 27) unless included
  • Fire alarm system design and programming
  • Owner-furnished equipment beyond connection
  • Site lighting foundations and trenching (coordinate Div 31/33)
  • Temporary lighting beyond stated allowance
What we measure

Line items in an electrical takeoff

Every group below is a separate section of the workbook. Units shown are the units the estimate reports in.

Service & distribution

EA
  • Service entrance by amperage and voltageEA
  • Switchboards and distribution panelsEA
  • Panelboards by type and circuit countEA
  • Transformers by kVAEA
  • Motor control centers and startersEA
  • Generator, ATS and paralleling gearEA

Feeders

LF
  • Conduit by size and type: EMT, RMC, PVCLF
  • Conductors by size and count, copper or aluminumLF / CLF
  • Ground conductorsLF
  • Pull boxes and junction boxesEA
  • Busway by amperageLF
  • Underground duct bank and manholesLF / EA

Branch circuits

LF · EA
  • Branch conduit by sizeLF
  • Branch wire by gaugeLF / CLF
  • MC cable where permittedLF
  • Home runs by length bandEA
  • Boxes, covers and fittingsEA
  • Wire management and supportsallowance

Devices

EA
  • Receptacles by type: standard, GFCI, isolated groundEA
  • Switches, dimmers and occupancy sensorsEA
  • Special outlets and disconnectsEA
  • Floor boxes and poke-throughsEA
  • Equipment connections by amperageEA
  • Device plates by finishEA

Lighting

EA
  • Fixtures by type from scheduleEA
  • Emergency and exit fixturesEA
  • Lighting controls: panels, relays, sensorsEA
  • Exterior and site lighting with poles and basesEA
  • Dimming and daylight harvestingEA / ZONE
  • Lamps, drivers and sparesallowance

Systems & misc.

EA · LF · LS
  • Fire alarm devices and rough-inEA
  • Data, voice and AV rough-inEA / LF
  • Security and access control rough-inEA
  • Grounding and bonding electrode systemLS
  • Lightning protection where shownLS
  • Temporary power and testingLS
Sample output

A electrical takeoff, as delivered

Single-story retail, 18,650 SF · estimate.xlsx
SummaryDiv 26ExclusionsAssumptions
Single-story retail, 18,650 SF estimate sample
DescriptionQtyUnitSheetMaterialLaborTotal
400A 208Y/120V service, CT cabinet, MDP1LSE-50128,0009,60037,600
Feeders, 4#3 to 4#500 kcmil, EMT/PVC1,120LFE-50122,40016,80039,200
Panelboards LP-1/2/3, 75 kVA xfmr4EAE-50218,4006,40024,800
Branch circuits, 3/4" EMT + #12 THHN9,600LFE-20119,20043,20062,400
Devices: recept., switches, sensors, 214 EA214EAE-2016,42012,84019,260
Lighting: 2x4 LED troffers, EM, exit, 148 EA148EAE-60137,00017,76054,760
Division 26 subtotal131,420106,600238,020
Basis: Gear per E-501/E-502 in the issued plan set. Branch lengths measured from E-201 with home runs from panel locations. Pricing should be aligned to current project conditions.
Electrical questions

Specific to this trade

How do you estimate home-run lengths?

From the panel location on the plans to each circuit's first device, measured along the likely conduit route, grouped into length bands. The method is stated so it can be checked against your own routing.

Are lighting fixtures priced or by others?

Priced from the fixture schedule when a basis of design is listed. When the schedule is a performance spec or the fixture package is owner-furnished, we carry installation only and say so.

Do you reconcile the one-line with the panel schedules?

Yes. Feeder count must match breaker count and panel schedules must match device circuiting. Mismatches in the drawings are flagged as assumptions rather than silently resolved.

Electrical bid due soon?

Send the relevant sheets and we'll come back with a price and a date.