Trades / Division 31
Division 31 · Earthwork

Earthwork estimating & takeoff services

Earthwork quantities from grading plans and sections: clearing, topsoil strip, cut, fill, import or export, structural excavation, backfill and erosion control, with swell and shrink stated.

Approach

How we estimate earthwork

Earthwork is where estimates swing the most, because the quantity depends on the method. We calculate cut and fill from the existing and proposed grading surfaces, by grid or by digital terrain model when the civil set includes one, and state the swell and shrink factors used so the haul and import numbers can be checked.

Building pad preparation, structural excavation for footings and utilities, backfill and compaction, rough and fine grading, and erosion control are each carried separately, with the geotechnical report's requirements for over-excavation and select fill reflected where the report is provided.

Division 31Typical detail, drawn for illustration
Drawings used
C-100 existing conditions, C-200 demolition, C-300 grading plan & sections, C-500 erosion control, geotechnical report, Spec 31 10 00 / 31 20 00 / 31 23 00 / 31 25 00
Reported in
AC · SF · CY · LF · SY · EA
Format
Editable Excel workbook, division tab with sheet references; PDF summary; written exclusions and assumptions.
Turnaround
Confirmed after we review the set and the project date.

Excluded by default

  • Rock excavation unless indicated on the drawings or geotech
  • Contaminated or hazardous soil handling
  • Dewatering beyond sump pumping
  • Unsuitable soils beyond stated allowance
  • Off-site improvements and right-of-way work
  • Survey, staking and testing fees
What we measure

Line items in an earthwork takeoff

Every group below is a separate section of the workbook. Units shown are the units the estimate reports in.

Site preparation

AC · SF · CY
  • Clearing and grubbingAC / SF
  • Tree removal by sizeEA
  • Topsoil strip and stockpile by depthCY
  • Demolition of pavement and structuresSF / CY
  • Construction entrance and stagingEA / SF
  • Site fencing and tree protectionLF

Mass grading

CY
  • Cut to grade, bank measureCY
  • Fill from on-site material, compactedCY
  • Import fill with shrink factorCY
  • Export with swell factor and haul distanceCY / MI
  • Rock excavation where indicatedCY
  • Unsuitable material removal allowanceCY

Building pad

CY · SF
  • Pad over-excavation per geotechCY
  • Structural fill, select, compacted in liftsCY
  • Moisture conditioningCY
  • Proof-rolling and testing coordinationSF
  • Pad fine gradingSF
  • Sub-slab granular base (coordinate Div 03)CY / TON

Structural excavation

CY · LF
  • Footing and grade beam excavationCY / LF
  • Elevator pit and deep excavationCY
  • Trenching for utilities by depthLF / CY
  • Backfill and compactionCY
  • Bedding and pipe zone materialCY / TON
  • Shoring, sloping and trench boxesLF / LS

Finish grading

SF · SY
  • Rough gradingSY
  • Fine grading at pavement and buildingSY
  • Topsoil respread by depthCY / SF
  • Slope grading and benchingSF
  • Swales and ditchesLF
  • Final dressing at landscape areasSF

Erosion & sediment control

LF · EA
  • Silt fenceLF
  • Inlet protectionEA
  • Stabilized construction entranceEA
  • Sediment basins and trapsEA / CY
  • Seeding, mulch and matting for stabilizationSF / SY
  • SWPPP inspections and maintenanceMO
Sample output

A earthwork takeoff, as delivered

Warehouse site, 5.2 acres · estimate.xlsx
SummaryDiv 31ExclusionsAssumptions
Warehouse site, 5.2 acres estimate sample
DescriptionQtyUnitSheetMaterialLaborTotal
Clearing & grubbing, light brush4.1ACC-201-14,35014,350
Topsoil strip, 6", stockpile on site3,420CYC-301-10,26010,260
Cut to grade, bank measure12,400CYC-301-37,20037,200
Fill, on-site, compacted 95%8,600CYC-301-34,40034,400
Export, 20% swell, 8 mi haul4,560CYC-301-41,04041,040
Silt fence, inlet protection, entrance1LSC-5018,9007,60016,500
Division 31 subtotal8,900144,850153,750
Basis: Cut/fill by DTM comparison of C-101 and C-301 in the issued plan set. Shrink 15%, swell 20%. No rock assumed where geotechnical information is not provided.
Earthwork questions

Specific to this trade

How do you calculate cut and fill?

By comparing existing and proposed surfaces: a grid method on simple sites, a digital terrain model where the civil set provides surfaces. The method is stated on the estimate with the shrink and swell factors applied.

What if there is no geotechnical report?

We estimate to the drawings and flag pad preparation, over-excavation and fill quality as assumptions. When the report arrives, those lines are revised.

Is rock included?

Only when the drawings or geotech indicate it. If borings show rock within the excavation depth, it is priced as a separate line so the risk is visible.

Earthwork bid due soon?

Send the relevant sheets and we'll come back with a price and a date.